West Campus Center at Santa Barbara Community College

Comments
Share
Leave a reply

Description
The new West Campus Center is a prominent landmark at Santa Barbara City College.  It is located near the traffic drop-off and turnaround on the west side of the college campus. Lundgren Management was the Construction Manager, utilizing the Multiple-Prime delivery method, and completed the project on-budget.  They brought in TITAN AEC as their premier BIM consultant. TITAN AEC was brought in by Lundgren Management to utilize building information modeling (BIM) on their construction management process.  TITAN AEC initially reviewed the initial set of construction documents.  After a preliminary review, TITAN AEC performed their own independent BIM coordination tests using Autodesk Navisworks to ensure there wasn't any major clashes between the architecture, structure, mechanical, electrical, plumbing & fire protection.  All clashes detected in the aggregated model was reported back to the construction manager such that the architect and their design team could resolve those clashes in their construction documentation package before submittal.
Clients

Lundgren Management

Consulting Services Provided
  • Construction Management
  • BIM Coordination
  • BIM Verification with Construction Documentation